Customization: | Available |
---|---|
Certification: | FSC, ISO, SGS |
Feature: | recyclable |
Still deciding? Get samples of US$ 0.02/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
D19mm Makeup Tube with Sponge Applicator is normally applied on beauty products like liquid highlighter.
It will bring us a super comfortable feeling to the skin with the soft sponge head.
Moreover, that could make our skin to be gorgeous glowing easily with just a few strokes.
Style |
Round PE tube |
Material | Tube PE, Cap PP |
Diameter | D19mm, 10-25ml per different length |
Printing | Silk creen printing, offset and hot stamping are avaliable |
Varnish | Glossy |
Applicator |
Sponge |
Usage | Liquid highlighter, liquid lluminator, concealer, makeup product, etc. |
MOQ | 20000 pcs |
Production time | 35 days |
Port of export | Guangzhou, Shenzhen |
FQA | ||||
1) What is the MOQ? | ||||
Our minimum order quantity is 10k~20k units per shape/colour/size. | ||||
2) What are your lead times? | ||||
Standard lead time is 35~50 days | ||||
3) Are they certified by any international standard in the area of Quality Management and Product Safety? If yes, please indicate | ||||
Yes, ISO9001:2015,ISO14001,ISO45001 | ||||
4) Have you implemented a Product Security System properly documented? | ||||
Yes, Good Manufacturing Practice periodically monitored & Hazard analysis programme. | ||||
ORGANICS: pest control system | ||||
PHYSICS: cleaning and sanitizing on the manufacturing line once a day | ||||
CHEMICALS: systematically manage the raw/packaging material by FIFO system | ||||
5) Is there a formal internal audit program? If so, what standards are audited to? | ||||
ISO standard and inspection report. | ||||
6) Is there a process to ensure customer requirements can be met prior to accepting a purchase order? | ||||
Yes, there is an inspection report submitted to customer when delivery. | ||||
7) Are there adequate verification activities such as inspection and testing, to ensure product delivered meets customer requirements? | ||||
Yes, IQC for income raw materials process, IPQC during mass production once an hour in each machine process; FQC with random inspect and OQC before shipping. | ||||
8) Do you perform incoming inspection? | ||||
Yes, materials need to be produce with ISO standard. Based on IQL standard, if defect rate above acceptable rate, full batch to be retrun for reproduction. | ||||
9) Is there a process for handling customer complaints? | ||||
Any compliant, an problem report will be issued from our systyem for customer to fill out. Meeting will be held urgently with report to feedback solution to customers. | ||||
10) Are procurement sources evaluated and monitored? | ||||
A. Confirm suppliers' production qualification if they are ISO audited, etc. | ||||
B. Samples required for testing and evaluation. | ||||
C. Evaluated service, feedback condition, flexibility for cooperatation. etc. | ||||
11) Is there a process for handling nonconforming products? | ||||
Yes, Defect rate beyound acceptable rate will be full batch to be return. Defect rate within acceptable rate, defected item will be crushed. |